Ringkasan Proyek

Total pengeluaran (material + upah)Rp 15.764.000
Budget materialRp 38.106.000
Sisa budget materialRp 23.082.000
Hari kerja tercatat2 hari

Pekerja

Upah Tukang (total / belum dibayar)Rp 440.000
Rp 140.000
Upah Kenek (total / belum dibayar)Rp 300.000
Rp 150.000
Total belum dibayarRp 290.000
Sudah dibayar Rp 450.000
PeranBudget upahUpah tercatatSisa budgetPemakaian
TukangRp 6.600.000Rp 440.000Rp 6.160.000
7%
KenekRp 4.500.000Rp 300.000Rp 4.200.000
7%
TotalRp 11.100.000Rp 740.000Rp 10.360.000
7%

Kelola pekerja

Budget per item

ItemBudgetTerpakaiSisaPemakaian
Batu SplitRp 1.200.000Rp 0Rp 1.200.000
0%
Besi Sloff Canopy (ulir 13) 5 batangRp 725.000Rp 0Rp 725.000
0%
Dinding Kamar Mandi (13 box)Rp 1.885.000Rp 0Rp 1.885.000
0%
Granit All Area (exc.K.Mandi)Rp 6.510.000Rp 4.061.000Rp 2.449.000
62%
Granit Lantai Kamar Mandi (3 box)Rp 540.000Rp 0Rp 540.000
0%
Granit Meja DapurRp 996.000Rp 0Rp 996.000
0%
List Plafon (18 batang)Rp 1.170.000Rp 0Rp 1.170.000
0%
MU 400 Granit - 16 sakRp 2.400.000Rp 0Rp 2.400.000
0%
PasirRp 1.600.000Rp 1.300.000Rp 300.000
81%
Pasir Cor (screding) + SloofRp 3.000.000Rp 0Rp 3.000.000
0%
pengerjaan Kusen dan Jendela DepanRp 8.000.000Rp 7.290.000Rp 710.000
91%
Plafon PVC (4dus 6meter)Rp 4.800.000Rp 0Rp 4.800.000
0%
Rangka Hollow Plafon (32 batang)Rp 1.100.000Rp 0Rp 1.100.000
0%
Ring/CincinRp 300.000Rp 0Rp 300.000
0%
SemenRp 2.480.000Rp 720.000Rp 1.760.000
29%
UruganRp 1.400.000Rp 1.400.000Rp 0
100%
Lain-lain-Rp 253.000-

Pembelian terakhir

TanggalItemBarangTotal
20/10/2026Granit All Area (exc.K.Mandi)Granit HortensaRp 4.061.000
20/10/2026pengerjaan Kusen dan Jendela DepanEngsel,grendel,penahan jendelaRp 290.000
20/10/2026Lain-lainSolatip,Todus,Dop 1/2Rp 17.000
20/10/2026Lain-lainKabel EternaRp 48.000
20/10/2026Lain-lainBatu BataRp 8.500

Catat pembelian Atur budget